Integration Line
Automation Casting Wheel Machining Line
The Automation line is designed for MDVD process (Multi Drill and Valve Drill). The Conveyor Transfer is handled by a Gantry unit to Runout checking (if the result is NG, it transfer to NG Conveyor ). Afterwards, the Workpiece is positioned and pick by the robot to be placed in MDVD Machine. Next, The robot pick the after machined Workpiece and place to Washing Conveyor. It transfers to Washing machine for washing and drying process.
Automation Engine Cover Machine Line
This is machining engine cover that previously process manual by operator from beginning to finish machining process. Now this machining process has been change to automatic with robotic system. Either transfer between stocker and cnc machine are handled by robot.
Share by: